Dubai Outlet Mall – HVAC Conversion Works CHW Piping

Stiine Electromechanical Works, we pride ourselves on being specialists in HVAC systems, and our recent project at Dubai Outlet Mall, Al Ain Road in Dubai, UAE is a shining example of our dedication to excellence.  this comprehensive HVAC system conversion involved a full team effort to upgrade and modernize the mall’s existing/new infrastructure.

Scope of Work: Comprehensive HVAC System Conversion

The project went beyond just installing new components. We focused on improving the entire system by upgrading key elements such as Fan Coil Units (FCUs) and Air Handling Units (AHUs), ensuring enhanced efficiency, better airflow, and long-term energy savings. Here’s a closer look at the core tasks:

  • CHW Piping: We installed chilled water (CHW) piping using both high-density polyethylene (HDPE) and mild steel (MS) pipes. Providing excellent durability and efficient thermal transfer, making the system more reliable for years to come.
  • Ducting Works: Custom ductwork was designed and installed to enhance air distribution, tailored specifically to meet the unique requirements of the mall’s HVAC needs.
  • Testing & Commissioning: After the system installation, our team rigorously tested and commissioned the new components to ensure everything functioned seamlessly.
  • Air & Water Balancing: To optimize the performance of the HVAC system, we performed detailed air and water balancing, ensuring that every part of the mall benefits from even airflow and cooling.

Why This Project Stands Out

The HVAC conversion at Dubai Outlet Mall was not a simple swap of parts. It was a carefully planned and executed project that required us to work with precision, ensuring minimal disruption to running mall operations while delivering maximum results.

Our team of highly skilled engineers and technicians worked tirelessly to seamlessly integrate the new systems with the existing/new infrastructure. The end result is a fully optimized HVAC system that enhances the shopping experience by providing more consistent temperature control, better air quality, and improved energy efficiency across the mall.